Acme continues to lead the Southern Nevada market in both industry plant and underground areas for 2008. Many new projects for existing clients and local agencies are currently underway which continues the culture developed during the last several 30 years.
Some of the new projects include the Hard Rock Hotel and Casino on/offsite dry utilities, Las Vegas Convention Center Expansion(s), City of North Las Vegas Traffic Signal Program(s) and the Nevada Power Company feeder projects.
Curt Swenson/Project Manager and Ryan Tabor/General Foreman continue to build out the Solids Dewatering Project for the Clark County Water Reclamation District. Load Center removal/relocation, duct bank/structure installation and preliminary building conduit systems have been their immediate focus. (Great workmanship and attention to detail during the first year of construction!)
Mark Bunrock/Project Manager, Joe Merriman/General Foreman and Dave Moore/General Superintendent along with many other company members continue to provide construction and design support to all of the local agencies and service provider for the traffic signal and underground construction throughout the Las Vegas Valley. (Keep up the high level of satisfied clients and completing projects on-time.)
Steve Sisneros and Kurk Williams continue to build the Acme Electric team by the continually mentoring, training and coaching. The philosophy that “We are always looking for a more efficient method of winning, building and collecting on projects” is at the forefront of their management style. Both Mr. Sisneros and Williams are greatly respected throughout the family of New-Com Inc. companies and the industry as a whole.
(Great Leaders develop Great Leaders, way to go Guys!)
Acme would like to welcome Susie Hayes and Dan Shreve into the Building Electrical Division. Both individuals come with many years of Industrial Plant Construction including leadership, engineering, estimating, installation, and integration skills. (Welcome to the Acme Team and Good Luck!)
|
| |
| Previous News |
|
|
|
| |
|
| |
| |
| Henderson WRF Phase III - Building Electrical -- Value: $10,000,000.00 |
| Scheduled to be completed in September 2007. Project consists of installation and integration of heavy industrial building electrical for the $70 million expansion of the existing main Sewer Treatment Plant Facility for the City of Henderson and surrounding areas. The scope included major duct bank backbone structure for new and future support, substation, control station, high voltage, low voltage, lighting protection, process controls and integration, generator, motor control centers and cathodic protection systems scopes.
|
| |
| |
| Encore at the Wynn Las Vegas -- Value: $3,000,000.00 |
| On schedule for completion in October 2007.
Project consists of the installation of new power transmission duct bank systems from existing substation facilities within the central part of the Las Vegas Valley. The work scope includes excavation, conduit and structure installation, backfilling and roadway restoration all being performed under an accelerated schedule for early completion. |
| view images |
| |
| SNWA-Raw Water Expansion Value: $5,000,000.00 |
| Estimated completion is September 2007.
Consisting of installation and integration of heavy industrial building electrical for the $30 million expansion of the existing water intake facility at Alfred Merritt Smith Water Treatment Facility, Lake Mead Nevada. The scope included onsite duct bank installation, substation, control station, high voltage, low voltage, lighting protection, process controls and integration for new structures and pump/motor installations. |
| |
| |
| Silverado/Las Vegas Blvd -- Value: $3,000,000.00 |
| Scheduled to be completed in July 2006. Project consisted of installing power and communication duct banks connecting existing infrastructure within the southwest portion of the Las Vegas Valley. Other associated work included traffic lighting, traffic signal systems and existing traffic signal modifications, high voltage cable within underground vaults/terminations, a separate duct bank system for fiber optic conduit with single mode installation, splicing and testing. |
| view images |
| |
| Golden Nugget - Nevada Power Upgrades -- Value: $3,000,000.00 |
| Project will be completed October 2007. Project consists of installation and modernization of existing Nevada Power Company duct banks, vaults and transmission facilities, and the demolition and removal of existing structures. The location of the work scope was within 30-50 year old Las Vegas downtown areas. The challenges based on the locations included many unknown existing substructures and utilities, caliche excavation and ground water, the requirement for minimum daily interruptions of owner operations. |
| view images |
| |
| Clark County Solids Dewatering Facility -- Value: $20,000,000.00 |
| Project to be completed 2010.
Consists of the construction of a solids pumping, transmission and dewatering facility at the Clark County Water Reclamation District. The pump station will consist of wet wells for primary and thickened waste activated sludges, six progressing cavity pumps and associated electrical and controls improvements. The sludges will be pumped approximately 1 mile to the New Solids Dewatering Facility which includes (2) 376,00 gallon storage tanks, progressing cavity centrifuge feed pumps, (8) high solids centrifuges, dewatering cake conveyance system, (4) cake storage bins, (4) rotary dischargers and (2) truck loading bays. Miles of interior and exterior conduit raceway systems have been included with the associated grounding, integration, controls, structures and conductor/cable installations. |